Skip to main content

eBrochure

4/22/2024

a green background with the words foundry lake street in black
Foundry Lake Street is Uptown Minneapolis apartment living at its finest:  sophisticated, glamorous, edgy with balance, always classy and cool. Urban rustic.

A mix of retail and uptown apartments, Foundry is set along the Midtown Greenway between Bde Maka Ska, Cedar Lake, and Lake of the Isles. Live near the lakes, restaurants, and bars, Whole Foods Market, trails, parks, and more.

From studios to three bedrooms, enjoy thoughtfully appointed finishes, polished designs, signature customer service, and hotel-style niceties. Run around the lakes or soak up the views from the rooftop pool deck. Work-from-home or bike to work along the Greenway. Head out or stay in. Either way, find your balance at Foundry.  

Floor Plan

Variable monthly utilities not included

Nickel 6

  • 2 Bed
  • 2 Bath
  • 1,178 Sq. Ft.
Inquire for details
MN_Minneapolis_FoundryLakeStreet_p1228777_Nickel6_2_FloorPlan
Call for details

Deposit: $500

All dimensions and square footage are approximate. Actual amenities and specifications may vary in dimension or detail. Not all features are available in every apartment. Pricing and availability are subject to change without notice.

Variable monthly utilities not included

Map View

Amenities

We offer flexible rent payment options with Flex.

Community Amenities

  • Conference Room
  • Work-from-home-spaces
  • Complimentary Coffee Bar
  • Concierge Services
  • Amenify - Professional Lifestyle Services for Residents
  • On-site Management
  • On-site Maintenance
  • Outdoor Fire Pits
  • Pool (heated)
  • Gourmet Grilling Station
  • Entertaining Spaces
  • Wet Bar
  • Flat Screen TVs
  • Cardio Machines
  • Free Weights
  • Strength Machines
  • Stretching Area
  • Speed Bag
  • Yoga/Spin Room
  • Wellbeats
  • City Views
  • Onsite Restaurant/Bar
  • Climate Controlled Parking Garage
  • Common Area WiFi
  • Fiber Speed Internet Connections
  • Furnished Guest Suite
  • Resident Storage
  • Bike Storage
  • Bike Repair Station
  • 100% Smoke Free

Apartment Amenities

  • Full-size Washer/Dryer
  • Solid Quartz Countertops
  • Kitchen Island
  • 42” Upper Cabinets
  • Kitchen Pantry*
  • Stainless Steel Whirlpool Appliances
  • Refrigerator Water/Ice Dispenser*
  • Gas Range
  • Oversized Windows
  • Roller Shades
  • Bedroom Ceiling Mounted Fan/Light
  • Balcony or Walk-Out Terrace*
  • Dual Vanity*
  • Tile Showers*
  • Plank Flooring
  • Spacious Walk-in Closets*
  • Built-in Closet Shelving

Sidebar

Pet Policy


Pets
Max 2 Allowed

Comments: Fenced Dog Run, Dog Wash Station. Pet Fee 250 (non-refundable) Pet Deposit 300 (refundable upon lease-completion) Pet Rent 50/mo. cat 50/mo. dog 75/mo. 2 pets (75lb weight limit 1 pet) (Max 2 pets; 120lb combined limit)

Restrictions: Breed restrictions apply

Office Hours


  • Monday: 9 AM to - 6 PM
  • Tuesday: 9 AM to - 6 PM
  • Wednesday: 1 PM to - 6 PM
  • Thursday: 9 AM to - 6 PM
  • Friday: 9 AM to - 6 PM
  • Saturday: 10 AM to - 5 PM
  • Sunday: Closed

Location